Phase 0 Construction

Print Friendly

4/24/17 – 30″ Pipe being installed

Lake Durango Pipe 3/4/17

12/14/16 – Road from CR 210 to Intake Structure

11/08/16 – Road from CR 210 to Intake Structure

10/26/16 – Road from CR 210 to Intake Structure

Construction Start