Raw Water to Treatment Plant – Phase 0

Print Friendly, PDF & Email

Preliminary design/engineering details for raw water pipeline being worked out between LPWWA, LDWA, SUIT & UMUT.

Proposed pipeline will follow parallel to CR 210 and then on 141 to 125 and then up to Lake Durango. preliminary design/engineering details for raw water pipeline being worked out between LPWWA, LDWA, SUIT & UMUT.

Raw Water Pipeline Only